Jump to main content or area navigation.

Contact Us

NPDES Permits in New England

Schiller Station Administrative Record

Note: The electronic index to the Administrative Record provided below includes a general "thumbnail" description of each document. EPA has endeavored to make these descriptions accurate and informative, but the descriptions may necessarily leave out some information and could possibly contain unintended errors. Please click on the descriptions provided to review the documents themselves.

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.

AR No. Date Type Description Author Recipient
AR-001 06/22/1990 Other - Fact Sheet 1990 Schiller Fact Sheet (PDF) (34 pp, 4.6 MB) EPA PSNH
AR-002 09/11/1990 Other – Original Permit Schiller Station 1990 NPDES Permit (PDF) (30 pp, 3.8 MB) EPA PSNH
AR-003 08/14/2009 Letter Schiller Station Monthly NPDES Discharge Monitoring Report, July 2009 (PDF) (2 pp, 327 K) PSNH EPA
AR-004 04/01/1983 Other Federal Register, Volume 48, No. 64, Friday, April 1, 1983, Rules and Regulations, Section 124.16, Stays of Contested Permit Conditions (PDF) (3 pp, 837 K) U.S. National Archives and Records Administration Public
AR-005 08/17/1990 Letter Certification of NPDES Permit Reissuance, PSNH Schiller, NH0001473 (PDF) (1 pg, 119 K) NHDES EPA
AR-006 08/22/1990 Letter Completion of the Federal Consistency Review - New Hampshire Office of State Planning (PDF) (1 pg, 112 K) NH Office of State Planning Permittee
AR-007 08/01/1990 Other U.S. EPA Review of Draft NPDES Permit Form and NPDES Industrial Permit Rating Worksheet (PDF) (4 pp, 552 K) EPA EPA
AR-008 08/03/1990 Letter NPDES Draft Permit No. NH0001473, PSNH General Agreement with Limitations and Conditions, August 3, 1990 (PDF) (2 pp, 438 K) PSNH EPA
AR-009 07/02/1990 Letter NPDES Permit, Schiller Station, Portsmouth, NH, Piscataqua River, NH0001473, Response to PSNH Comments on Their Draft NPDES Permit Application and Attachment (PDF) (4 pp, 712 K) NH Fish and Game Department NHDES
AR-010 06/13/1990 Letter PSNH Schiller, NPDES Permit No. NH0001473, Comments on the 14-Day Draft Permit for Schiller Station (PDF) (4 pp, 538 K) NHDES EPA
AR-011 05/04/2010 Letter Information Request for NPDES Permit Re-issuance NPDES Permit No. NH0001473 (PDF) (9 pp, 1.4 MB) EPA PSNH
AR-012 06/01/1990 Letter NPDES Draft Permit No. NH0001473 Review of Draft Permit General Agreement with Several Comments on Outfalls (PDF) (4 pp, 623 K) PSNH EPA
AR-013 05/20/2010 Letter Response to Request for Supplemental Information dated May 4, 2010 and Request for Extension for Time to Respond (PDF) (2 pp, 419 K) PSNH EPA
AR-014 06/27/1990 Letter Forwarding Copy of Draft Permit NH0001473, Public Service Company of New Hampshire (PDF) (2 pp, 265 K) EPA NHDES
AR-015 06/01/2010 Letter Response to PSNH 5/20/2010 Letter Regarding Supplemental Information and Time Extension (PDF) (3 pp, 507 K) EPA PSNH
AR-016 06/17/2010 Letter Public Service Company of New Hampshire/Schiller Station: Request for Information (Extension) (PDF) (4 pp, 683 K) PSNH EPA
AR-017 07/09/2010 Letter Information Request for NPDES Permit Re-issuance, NPDES Permit No: NH0001473 (Clarifications) (PDF) (4 pp, 725 K) EPA PSNH
AR-018 05/23/2009 Technical/ Scientific Paper Economics of Biodiversity and Sustainable Fisheries Management, Ecological Economics, www.elsevier.com/locate/ecolecon (PDF) (5 pp, 1.32 MB) Wisdom Akpalu Public
AR-019 08/10/2010 Letter Information Request for NPDES Permit Re-issuance, NPDES Permit No: NH0001473 (Extension of Extension) (PDF) (2 pp, 297 K) EPA PSNH
AR-020 08/31/2010 Ambient Data Aerial Map Showing Temperature Plume with Buoys (PDF) (1 pg, 186 K) EPA PSNH
AR-021 09/20/2010 Letter Thermal Data for Schiller Station Collected from 15 August through 15 September 2010 (PDF) (2 17 pp, 5.5 MB) Normandeau PSNH
AR-022 09/24/2010 Letter Public Service Company of New Hampshire, Schiller Station, Portsmouth, NH, National Pollutant Discharge Elimination System Permit No. NH0001473, Response to Information Request in Support of NPDES Permit Reissuance (First of Three Monthly Temperature Data Reports) (PDF) (4 pp, 639 K) PSNH EPA
AR-023 09/29/2010 Letter Public Service Company of New Hampshire, Schiller Station, Portsmouth, NH, National Pollutant Discharge Elimination System Permit No. NH0001473, Response to Information Request in Support of NPDES Permit Reissuance (Replacement Pages) (PDF) (4 pp, 1.6 MB) PSNH EPA
AR-024 11/04/2006 Technical/ Scientific Paper Impacts of Biodiversity Loss on Ocean Ecosystem Services, Science, Volume 314, www.sciencemag.org (PDF) (5 pp, 1.6 MB) Boris Worm, Edward Barbier, et al Public
AR-025 01/01/1999 Technical/ Scientific Paper Ecosystem Services Generated by Fish Populations, Ecological Economics 29 (1999), pp 253-268, Elsevier Science, B V. (PDF) (16 pp, 4 MB) C. Holmlund, M. Hammer, Stockholm University Public
AR-026 06/01/2011 Technical/ Scientific Paper Desalination Plant Intakes, Impingement and Entrainment Impacts and Solutions, WaterReuse Association Desalination Committee (PDF) (22 pp, 3.4 MB) WaterReuse Association Public
AR-027 01/01/1987 Technical/ Scientific Paper Reductions in Ichthyoplankton Entrainment with Fine-Mesh, Wedge-Wire Screens, North American Journal of Fisheries Management 7-386-393, 1987 (PDF) (8 pp, 1.6 MB) S. Weisberg, W. Burton, F. Jacobs, E. Ross Public
AR-028 06/01/2006 Technical/ Scientific Paper Field Evaluation of Wedgewire Screens for Protecting Early Life Stages of Fish at Cooling Water Intake Structures, Chesapeake Bay Studies, Electric Power Research Institute (EPRI) (PDF) (7 pp, 950 K) Electric Power Research Institute (EPRI) Public
AR-029 01/01/2003 Technical/ Scientific Paper State of Maryland Perspectives on Cooling Water Intake Technologies to Protect Aquatic Organisms, Power Plant Research Program, Maryland Department of Natural Resources (PDF) (25 pp, 4.8 MB) Maryland Department of Natural Resources Public
AR-030 10/17/2014 Email String Email String Regarding EPA Receiving a Copy of PSNH's Report Prepared by Enercon Services in 2008 on Conceptual-Level Engineering and Feasibility Analyses on Various CWIS Technologies and Operational Measures (PDF) (3 pp, 96 K) EPA Permittee
AR-031 04/30/2010 Other Response to Biological Aspects of NYSDEC (New York State Department of Environmental Conservation) 401 Certification Letter (PDF) (36 pp, 4.7 MB) LWB Environmental, Normandeau NYSDEC
AR-032 08/13/2014 Other Comments to the California State Water Resources Control Board on the Draft Staff Report Including the Draft Substitute Environmental Documentation (Desalination Amendments) (PDF) (11 pp, 411 K) Alden Research Laboratory, Timothy Hogan California State Water Resources Control Board
AR-033 01/01/2002 Technical/ Scientific Paper Seawater Desalination Intake Technical Feasibility Study, scwd2 Desalination Program, page 2-9 (PDF) (13 pp, 3 MB) Kennedy/Jenks Consultants Public
AR-034 03/29/2013 Technical/ Scientific Paper Indian Point Energy Center Environmental Report, March 29, 2013, Chapter 4.0, Potential Significant Adverse Environmental Impacts, page 4-1 (PDF) (1 pg, 273 K) Indian Point Energy Center Not Specified
AR-035 09/11/2005 Other Fish Protection Technologies: The US Experience, page 377 (PDF) (1 pg, 203 K) Unknown Not Specified
AR-036 09/01/2000 Technical/ Scientific Paper Fish Protection Technologies: A Status Report (PDF) (5 pp, 617 K) Alden Research Laboratory, E. P. Taft Public
AR-037 06/22/1989 Letter Schiller Station, NPDES Permit No. NH0001473, Advising of Upcoming Compliance Evaluation Inspection (CEI) or a Compliance Sampling Inspection (CSI) (PDF) (3 pp, 439 K) EPA PSNH
AR-038 10/22/2010 Letter Thermal Data Requested by the United States Environmental Protection Agency 15 September 2010 through 14 October 2010, Schiller Station (PDF) (20 pp, 2.4 MB) Normandeau PSNH
AR-039 10/25/2010 Letter Public Service Company of New Hampshire, Schiller Station, Portsmouth, New Hampshire, National Pollutant Discharge Elimination System Permit No. NH0001473, Response to Information Request in Support of NPDES Permit Reissuance (Second of Three Monthly Reports - September 15 through October 14, 2010 (Cover Letter Only) (PDF) (1 pg, 185 K) PSNH EPA
AR-040 08/26/2010 Sampling Form Sampling and Analysis Plan for Schiller Station Thermal Plume Monitoring Project (PDF) (5 pp, 357 K) EPA PSNH
AR-041 10/28/2010 Letter Response to Information Request for Permit Re-issuance – Tables Containing Operational Data for Three Schiller Station Generating Units (PDF) (5 pp, 746 K) PSNH EPA
AR-042 09/24/2010 Letter Submittal of Thermal Data for the Period 15 October to 15 November Prepared by Normandeau (PDF) (19 pp, 2.1 MB) PSNH EPA
AR-043 11/29/2010 Letter Response to Information Request for Permit Re-issuance – Submission of Thermal Data for Third of Three Months (October 15 to November 15, 2010 (PDF) (4 pp, 165 K) PSNH EPA
AR-044 06/01/1995 Other Public Service Company of New Hampshire, Schiller Station, Portsmouth, NH, NPDES Reapplication Permit No. NH0001473, June 1, 1995 (PDF) (115 pp, 18 MB) PSNH EPA
AR-045 02/21/1994 Letter Notification of Piping Modifications Being Made to Eliminate the Discharge of Process Water and Eliminate Outfalls (PDF) (1 pg, 137 K) PSNH, Ronald Chevalier EPA, Edward McSweeney
AR-046 09/20/2010 Letter National Pollutant Discharge Elimination System (NPDES), Compliance Evaluation Inspection (CEI), PSNH, Schiller Station, Portsmouth, NH, NPDES Permit NH0001473 (PDF) (1 pg, 152 K) NHDES PSNH
AR-047 09/14/2010 Letter Submittal of August 2010 DMR including Note that a Zero Will Now Be Reported When Result is Less Than the Method Detection Limit (PDF) (2 pp, 279 K) PSNH EPA
AR-048 09/13/2010 Letter National Pollution Discharge Elimination System, Compliance Evaluation Inspection (CEI), PSNH - Schiller Station, NPDES Permit No. NH0001473, Response to Deficiencies Noted During July 2010 Compliance Evaluation Inspection (PDF) (2 pp, 314 K) Northeast Utilities NHDES
AR-049 08/16/2010 Letter National Pollutant Discharge Elimination System (NPDES), Compliance Evaluation Inspection (CEI), PSNH Schiller Station, Portsmouth, NH, NPDES Permit NH0001473, Notification of Deficiencies in August 2010 Compliance Evaluation Inspection (PDF) (4 pp, 558 K) NHDES PSNH
AR-050 9/25/2009 Letter National Pollutant Discharge Elimination System (NPDES), Compliance Evaluation Inspection (CEI), PSNH Schiller Station, Portsmouth, NH, NPDES Permit NH0001473, Notification of Deficiencies in August 2010 Compliance Evaluation Inspection (PDF) (4 pp, 729 K) NHDES PSNH
AR-051 07/28/2011 Letter National Pollutant Discharge Elimination System (NPDES), Compliance Evaluation Inspection (CEI), PSNH - Schiller Station, NPDES Permit NH0001473, Violations Summary April 2010 through May 2011 (PDF) (8 pp, 1.3 MB) NHDES PSNH
AR-052 07/10/1995 Letter NPDES Reapplication No. NH0001473 (Schiller Station) Notification of Permit Application Completeness (PDF) (2 pp, 231 K) EPA PSNH
AR-053 09/10/2002 Letter Relocation of Outfalls 016/017 in Schiller Station's NPDES No. NH0001473 from Direct Discharge to Intertidal Zone to Direct Discharge to Either Outfall 002, 003, and/or 004 (PDF) (2 pp, 324 K) EPA PSNH
AR-054 08/16/2002 Letter Schiller Station NPDES Permit No. NH0001473, Wastewater Treatment Plant Discharge (Outfalls 016 and 017 - Re-piping Discharger to Outfalls 002, 003, and 004) (PDF) (2 pp, 226 K) PSNH EPA
AR-055 10/22/2002 Letter National Pollutant Discharge Elimination System (NPDES) Permit No. NH0001473, Authorization to Remove Deteriorated Rotating Screens (PDF) (1 pg, 131 K) EPA PSNH
AR-056 10/02/2002 Letter Schiller Station, NPDES Permit No. NH 0001473, Relocation of Outfalls 016/017 to Outfalls 002, 003, and 004, Acceptance of Conditions for Relocation (PDF) (1 pg, 131 K) PSNH EPA
AR-057 10/02/2002 Letter Schiller Station Unit 3 Intake Structure, NPDES Permit No. NH0001473, Request for Permanent Removal of Corroded Rotating Screens from Unit 3 (PDF) (1 pg, 164 K) PSNH EPA
AR-058 04/11/1996 Letter Fourteen-day Notification Review, NPDES Application No. NH0001473 for Schiller Station, Portsmouth, NH (PDF) (2 pp, 459 K) EPA PSNH
AR-059 01/25/1995 Letter NPDES Permit NH0001473, PSNH, Schiller Station, Elimination of Outfalls 007, 008, and 009 from Permit (PDF) (1 pg, 167 K) EPA PSNH
AR-060 9/12/1990 Letter NPDES Application No. NH0001473, Issue of Final 1990 NPDES Permit (PDF) (1 pg, 107 K) EPA PSNH
AR-061 09/02/2004 Letter Schiller Station, NH0001473, Northern Wood Power Project, Wastewater Retention Basin Relocation (PDF) (3 pp, 407 K)    
AR-062 06/13/2003 Letter NPDES Permit No. NH0001473, Schiller Station, Public Service Company of New Hampshire, issued September 11, 1990, Modified May 31, 1991, Modified January 24, 1995 - Monthly NPDES Discharge Monitoring Report, May 2003 and Notice that Unit 3 is Retired (PDF) (2 pp, 409 K) PSNH EPA
AR-063 09/30/1992 Letter Individual Stormwater Application for Schiller Station, NPDES Permit No. NH0001473, Submittal of Forms 1 and 2 F for Individual Stormwater Discharge Permit (PDF) (24 pp, 4.1 MB) PSNH EPA
AR-064 06/03/2004 Other EPA New England Inspector’s Multimedia Checklist for Schiller (PDF) (7 pp, 1 MB) EPA EPA
AR-065 09/18/2008 Letter NPDES Permit No. NH0001473, Schiller Station, Public Service Company of New Hampshire, Issued September 11, 1990, Modified May 31, 1991, Modified January 24, 1995, Noncompliance Notification (PDF) (2 pp, 322 K) PSNH EPA
AR-066 03/26/2008 Letter Hazardous Waste Limited Permit Application Schiller Station (PDF) (3 pp, 528 K) NHDES PSNH
AR-067 04/30/2007 Email Schiller Station Overflow Report (PDF) (2 pp, 197 K) PSNH EPA
AR-068 11/23/2005 Letter NPDES Permit No. NH0001473, Schiller Station, Public Service Company of New Hampshire, issued September 11, 1990; Modified May 31, 1991; Modified January 24, 1995, Schiller Station 5-Day NPDES Permit No. NH0001473, Schiller Station, Public Service Company of New Hampshire, issued September 11, 1990; Modified May 31, 1991; Modified January 24, 1995, Schiller Station 5-Day Noncompliance Notice (PDF) (2 pp, 288 K) PSNH EPA
AR-069 09/30/2005 Letter Schiller Station, NPDES Permit No. NH0001473, RE: Letter (C11556), from R. A. Janson to J. M. MacDonald dated September 10, 2002, Notification of Piping Modification Completed on August 31, 2005 (PDF) (1 pg, 128 K) PSNH EPA
AR-070 03/26/2007 Letter Discharge Monitoring Report Forms April – December 2007 (PDF) (2 pp, 449 K) EPA PSNH
AR-071 5/01/2007 Letter NPDES Permit No. NH0001473, Schiller Station, Public Service Company of New Hampshire, issued September 11, 1990, Modified May 31, 1991; Modified January 24, 1995, Five Day Noncompliance Notification (PDF) (2 pp, 266 K) PSNH EPA
AR-072 05/15/2007 Letter Individual Stormwater Application for Schiller Station, NPDES Permit No. NH0001473, Submittal of Forms 1 and 2 F for Individual Stormwater Discharge Permit (PDF) (2 pp, 310 K) PSNH EPA
AR-073 03/06/1998 Letter Schiller Station NPDES Permit No. NH0001473, Wastewater Treatment Plant Discharge (Outfalls 008 and 009) (PDF) (12 pp, 1.7 MB) PSNH NHDES
AR-074 06/18/2006 Letter Discharge Monitoring Report Forms for January - December 2005 and January to March 2006 (PDF) (2 pp, 457 K) EPA PSNH
AR-075 11/24/2004 Letter NPDES Permit No. NH0001473, Schiller Station, Public Service Company of New Hampshire, issued September 11, 1990, Modified May 31, 1991, Modified January 24, 1995, Schiller Station 5-Day Noncompliance Notification (PDF) (3 pp, 370 K) PSNH EPA
AR-076 12/12/2003 Letter Discharge Monitoring Report Forms, January – December 2004 (PDF) (2 pp, 427 K) EPA PSNH
AR-077 04/14/2003 Letter Follow-up to Noncompliance Notification dated Mary 14, 2003 (PDF) (2 pp, 293 K) PSNH EPA
AR-078 03/14/2003 Letter NPDES Permit No. NH0001473, Schiller Station, Public Service Company of New Hampshire, issued September 11, 1990, Modified May 31, 199; Modified January 24, 1995, Schiller Station Noncompliance Notification (PDF) (3 pp, 440 K) PSNH EPA
AR-079 01/10/2003 Letter Discharge Monitoring Report Forms January – December 2003 (PDF) (2 pp, 464 K) EPA PSNH
AR-080 09/25/2002 Letter National Pollutant Discharge Elimination System (NPDES) Permit No. NH0001473, Approved Modifications to Intake of Unit 4 (PDF) (3 pp, 367 K) EPA PSNH
AR-081 08/16/2006 Letter Schiller Station NPDES Permit No. 0001473, Unit 4 Intake Structure (PDF) (6 pp, 717 K) PSNH EPA
AR-082 02/06/2002 Other Schiller Station January 7, 2002 Oil Spill Report (PDF) (4 pp, 670 K) PSNH EPA
AR-083 01/08/2002 Email Schiller Spill Update (PDF) (1 pg, 78 K) Northeast Utilities EPA
AR-084 01/07/2002 Email Schiller Station Oil Release (PDF) (1 pg, 93 K) Northeast Utilities EPA
AR-085 02/13/1987 Letter Schiller Station - NPDES No. NH0001473 - Confirmation of PSNH Successfully Addressing Items in EPA Letter of May 2, 1986 (PDF) (1 pg, 121 K) EPA Permittee
AR-086 04/03/2001 Email Surfactant Monitoring (PDF) (1 pg, 123 K) NHDES Northeast Utilities
AR-087 03/27/2001 Letter PSNH Schiller Station Coal Yard Sprays, NPDES Permit No. NH0001473 (PDF) (10 pp, 1.2 MB) Northeast Utilities NHDES
AR-088 03/22/2001 Email Schiller Station Overflow Event at Coal Pile Runoff Retention Basin to be Reported on Outfall 013 DMR (PDF) (1 pg, 80 K) Northeast Utilities EPA
AR-089 05/01/2007 Email Notification Draft – U5 Overflow Noncompliance (PDF) (3 pp, 355 K) PSNH EPA
AR-090 05/02/2007 Email Noncompliance Notification (PDF) (3 pp, 380 K) PSNH EPA
AR-091 01/18/2008 Letter Discharge Monitoring Report (DMR) Forms 2008 for January to December 2008 (PDF) (2 pp, 473 K) EPA PSNH
AR-092 12/22/2004 Letter NPDES Permit NH0001473, Noncompliance Notification D21803 - Corrected Information (PDF) (2 pp, 385 K) PSNH EPA
AR-093 11/04/2005 Letter NPDES Compliance Evaluation Inspection (CEI), PSNH - Schiller Station, NPDES Permit NH0001473 (PDF) (2 pp, 345 K) NHDES PSNH
AR-094 09/21/2007 Letter Schiller Station CEI, NPDES Permit No NH0001473 Corrective Actions Taken (PDF) (3 pp, 373 K) PSNH NHDES
AR-095 08/21/2007 Letter National Pollutant Discharge Elimination System (NPDES), Compliance Evaluation Inspection (CEI), PSNH Schiller Station, NPDES Permit NH0001473, Report of July 27, 2007 Inspection (PDF) (4 pp, 697 K) NHDES PSNH
AR-096 01/17/2008 Letter National Pollutant Discharge Elimination System (NPDES), Compliance Evaluation Inspection (CEI), PSNH - Schiller Station, NPDES Permit NH0001473 (PDF) (1 pg, 154 K) NHDES PSNH
AR-097 07/31/2008 Letter National Pollutant Discharge Elimination System, Compliance Evaluation Inspection (CEI), PSNH Schiller Station, NH0001473 Inspection Report for July 29, 2008 (PDF) (4 pp, 708 K) NHDES PSNH
AR-098 08/27/2008 Letter National Pollutant Discharge Elimination System, Compliance Evaluation Inspection (CEI) July 29, 2008, PSNH - Schiller Station, NH 0001473, DES Compliance Letter (PDF) (2 pp, 276 K) NHDES PSNH
AR-099 10/21/2004 Letter National Pollutant Discharge Elimination System Compliance Evaluation Inspection (CEI) at Schiller Station, Permit No. NH0001473, EPA Water Compliance Inspection Report (PDF) (2 pp, 340 K) NHDES PSNH
AR-100 06/30/2004 Other - Water Inspection Report EPA Water Compliance Inspection Report - Schiller Station June 30, 2004 (PDF) (4 pp, 669 K) EPA PSNH
AR-101 06/27/2002 Letter NPDES Inspection Worksheet EPA Reporting Bench Sheet and NPDES Compliance Manual, May 29, 2002 (PDF) (25 pp, 3.1 MB) PSNH NHDES
AR-102 07/17/2002 Letter Letter of Compliance for Compliance Evaluation Inspection, Schiller Station, July 17, 2002 (PDF) (2 pp, 312 K) NHDES PSNH
AR-103 06/30/2002 Other NPDES Inspection Worksheet Completed May 20, 2002, Schiller Station, NH0001473 (PDF) (2 pp, 371 K) NHDES Permittee
AR-104 05/05/2002 Other EPA Water Compliance Inspection at Schiller Station, May 5, 2000 (PDF) (1 pg, 179 K) EPA Permittee
AR-105 07/30/1999 Letter Compliance Evaluation Inspection (CEI) and Deficiencies, May 17, 1999 (PDF) 1 pg, 13 K) NHDES Northeast Utilities
AR-106 05/30/1997 Letter National Pollution Discharge Elimination System (NPDES) Permit, PSNH-Schiller Station, Permit NH0001473, Compliance Evaluation Inspection (CEI), March 27, 1997 (Page 1 Only of Letter and EPA Water Compliance Inspection Report of March 27, 1997) (PDF) (2 pp, 322 K) NHDES Permittee
AR-107 07/01/1996 Letter National Pollutant Discharge Elimination System (NPDES) Permit, PSNH-Schiller Station, Permit NH0001473, May 1, 1996 Compliance Evaluation Inspection (CEI) (PDF) (2 pp, 372 K) NHDES Northeast Utilities
AR-108 07/14/1995 Letter National Pollutant Discharge Elimination System (NPDES) Permit, PSNH - Schiller Station, Permit NH0001473, May 1 and 2, 1995 Compliance Sampling Inspection (PDF) (2 pp, 333 K) NHDES Northeast Utilities
AR-109 04/08/1994 Other National Pollutant Discharge Elimination System Permit NH0001473, November 30, 1993 NPDES Compliance Evaluation Inspection (CEI) (PDF) (6 pp, 706 K) NHDES Permittee
AR-110 04/16/1993 Other National Pollutant Discharge Elimination System (NPDES) Compliance Inspection; PSNH Schiller Station; NPDES Permit NH0001473, March 22, 1993 (PDF) (6 pp, 774 K) NHDES Permittee
AR-111 09/21/1992 Technical National Pollutant Discharge Elimination System (NPDES) Compliance Inspection, PSNH - Schiller Station, NPDES Permit NH0001473, Follow-up to September 17, 1992 Inspection (PDF) (4 pp, 649 K) NHDES Permittee
AR-112 07/22/1992 Technical National Pollutant Discharge Elimination System (NPDES) Compliance Inspection; PSNH - Schiller Station; NPDES Permit NH0001473, Compliance Evaluation Inspection May 18, 1992 (PDF) (8 pp, 619 K) NHDES Permittee
AR-113 01/21/1992 Other NPDES Permit NH0001473, Follow-up Inspection at Schiller Station, December 16, 1991 (PDF) (6 pp, 726 K) NHDES PSNH
AR-114 11/12/1991 Other NPDES Permit No. NH 0001473, Compliance Evaluation Inspections at Schiller Station, April 23 and May 24, 1991 (PDF) (6 pp, 863 K) NHDES PSNH
AR-115 10/25/1994 Legal Settlement Agreement, New Hampshire Department of Environmental Services and Public Service Company of New Hampshire, Letter of Deficiency, Cooling Water Intake Screenhouses at Schiller Station, October 1994 (PDF) (4 pp, 539 K) NHDES PSNH
AR-116 01/25/2008 Other Request for Extension of Due Date for Supplemental Information Request, Newington and Schiller Stations January 2008 - EPA Agreement (PDF) (3 pp, 342 K) EPA PSNH
AR-117 12/11/2006 Other Announcement-PSNH's Northern Wood Power Project Went Into Service in Portsmouth, NH, 2006 (PDF) (1 pg, 144 K) PSNH EPA
AR-118 10/31/2007 Other Supplemental Information Request Pursuant to Section 308 of the Clean Water Act to Supersede Previous Letter dated December 30, 2004 for Schiller Station NPDES Permit Reissuance (NPDES Permit No: NH0001473) (PDF) (5 pp, 915 K) EPA PSNH
AR-119 12/30/2004 Other Supplemental Information Requirements Pursuant to Section 308 of the Clean Water Act (CWA) for Schiller Station Permit Reissuance (NPDES Permit No. NH0001473) (PDF) (6 pp, 990 K) EPA PSNH
AR-120 10/23/2009 Other National Pollutant Discharge Elimination System (NPDES) Compliance Evaluation Inspection (CEI), Schiller Station, NPDES Permit No. NH-0001473 (Follow-up to September 2009 Report) (PDF) (1 pg, 147 K) NHDES PSNH
AR-121 09/10/2010 Other PSNH Cover Letter and Enercon-Prepared Response, Public Service Company of New Hampshire, Schiller Station, Portsmouth, NH, National Pollutant Discharge Elimination System Permit No. NH0001473, Response to Information Request in Support of NPDES Permit Reissuance, September 10, 2010 (PDF) (14 pp, 1.4 MB) Permittee EPA
AR-122 07/03/1990 Other Joint Public Notice of a Draft of a National Pollutant Discharge Elimination System (NPDES) for Schiller Station, July 3, 1990 and Mailing List (PDF) (6 pp, 830 K) NHDES/EPA Public
AR-123 09/30/2005 Letter Schiller Station, NPDES Permit No. NH0001473, Reference Letter C11556 from R. A. Janson to J. M. McDonald dated September 10, 2002, PSNH Successfully Repiped Discharge of Schiller Wastewater Treatment Facility (Outfall 016/017) to Cooling Water Discharges (PDF) (1 pg, 123 K) PSNH EPA
AR-124 10/26/2005 Letter Schiller Station, NPDES NH0001473, Forwarding of Plans for Modifications in the Main Coal Yard at Schiller Station (PDF) (2 pp, 255 K) PSNH EPA
AR-125 07/01/2005 Other -Drawing Pre-Development Watershed Plan, Drainage Swale Modifications to Coal Yard (Drawing No. WS-1) (PDF) (1 pg, 138 K) Haight Engineering PSNH
AR-126 07/01/2005 Other -Drawing Post-Development Watershed Plan, Drainage Swale Modifications to Coal Yard (Drawing No. WS-2) (PDF) (1 pg, 415 K) Haight Engineering PSNH
AR-127 06/30/2005 Other -Drawing Existing Conditions & Demolition Plan, Drainage Swale Modifications to Coal Yard (Drawing C-1) (PDF) (1 pg, 377 K) Haight Engineering PSNH
AR-128 06/30/2005 Other -Drawing Site Plan, Drainage Swale Modifications to Coal Yard (Drawing C-2) (PDF) (1 pg, 278 K) Haight Engineering PSNH
AR-129 06/30/2005 Other -Drawing Grading Drainage & Erosion Control Plan, Drainage Swale Modifications to Coal Yard (Drawing C-3) (PDF) (1 pg, 460 K) Haight Engineering PSNH
AR-130 08/16/2005 Site Specific Technical Study Drainage Review for Public Service of New Hampshire Coal Yard at Schiller Station, Portsmouth, NH, August 16, 2005 (PDF) (38 pp, 4.9 MB) Waterfront Engineers, Haight Engineering PSNH
AR-131 06/21/1989 Other EPA NPDES Compliance Inspection Report, Schiller Station, June 21, 1989 (PDF) (1 pg, 223 K) EPA PSNH
AR-132 11/04/2005 Other EPA NPDES Compliance Inspection Report, Schiller Station, June 21, 1989 (PDF) (2 pp, 373 K) NHDES PSNH
AR-133 02/28/2010 Facility Effluent Data Discharge Monitoring Report (DMR) Data December 30, 1990 to February 28, 2010 (PDF) (25 pp, 5 MB) Not Specified Not Specified
AR-134 09/28/2007 Letter Letter of Thanks for Collaboration on Northern Wood Power Project and Forwarding of PSNH Newspaper Ad Thanking the Public (PDF) (2 pp, 298 K) PSNH EPA
AR-135 05/09/1990 Letter NPDES Application No. NH0001473, Forwarding of Draft Permit to PSNH, May 9, 1990 (PDF) (2 pp, 260 K) EPA PSNH
AR-136 04/01/2008 Site-specific Technical/ Scientific Study Entrainment and Impingement Studies Performed at Schiller Generating Station from September 2006-September 2007 (PDF) (380 pp, 66.7 MB) Normandeau PSNH
AR-137 12/10/2007 Letter Request for Extension to Respond to Supplemental Information Request, Newington Station and Schiller Station (PDF) (6 pp, 463 K) PSNH EPA
AR-138 04/13/2010 Letter Coastal Zone Management Act Federal Consistency Certification for Reissuance of the PSNH Schiller Station National Pollutant Discharge Elimination System (NPDES) Permit (NH0001473) (PDF) (2 pp, 259 K) NHDES PSNH
AR-139 09/13/2010 Other Public Service Company of New Hampshire, Schiller Station, NPDES Permit No. NH0001473, NPDES Reapplication, Update to Renewal Application Originally Submitted on June 1, 1995, September 2010 (PDF) (112 pp, 20.1 MB) PSNH EPA
AR-140 10/01/2008 Other Response to United States Environmental Protection Agency CWA §308 Letter, PSNH Schiller Station, Portsmouth, New Hampshire, October 2008, Redacted (PDF) (116 pp, 3 MB) PSNH EPA
AR-141 05/04/2010 Letter Information Request for NPDES Permit Reissuance, NPDES Permit No. NH0001473 (PDF) (9 pp, 1.4 MB) EPA Permittee
AR-142 11/30/90 Facility Effluent Data Outfall 001A, Monthly Reporting November 30, 1990 to July 31, 2012 (PDF) (50 pp, 1.2 MB) Permittee Not Specified
AR-143 02/13/2013 Meeting Agenda Agenda for Schiller Station Site Visit, February 13, 2013 (PDF) (1 pg, 47 K) EPA Not Specified
AR-144 10/09/2009 Letter National Pollution Discharge Elimination System, Compliance Evaluation Inspection (CEI), PSNH - Schiller station, NPDES Permit Number NH0001473, Letter in Response to Deficiency Noted in September 16, 2009 CEI (PDF) (1 pg, 198 K) Permittee NPDES
AR-145 01/09/2009 Letter Discharge Monitoring Report Forms (PDF) (2 pp, 455 K) EPA PSNH
AR-146 09/04/2013 Letter PSNH Schiller Station, Portsmouth, NPDES/State Permit No. NH0001473, Approval for Continuation of 1990 Thermal Limits (PDF) (1 pg, 150 K) NHDES EPA
AR-147 10/18/1995 Letter Schiller Station, NPDES Permit No. NH0001473, June 1, 1995 Reapplication, Accumulation of Copper at Schiller Station (Letter only) (PDF) (1 pg, 179 K) Permittee EPA
AR-148 06/03/2004 Other Water Compliance Inspection Report, June 4, 2003 (PDF) (1 pg, 216 K) EPA Permittee
AR-149 09/04/2013 Letter PSNH Schiller Station, Portsmouth, NPDES/State Permit No. NH0001473, NHDES Approval of Continuing 1990 Thermal Limits (PDF) (1 pg, 150 K) NHDES EPA
AR-150 01/29/1990 Letter Discharge Monitoring Report Forms January 1990 to December 1990 (PDF) (14 pp, 393 K) EPA PSNH
AR-151 10/01/2012 Other Schiller Timeline, Meeting Notes, Site Visits Notes, Other Notes (PDF) (4 pp, 1 MB) EPA, Michael Cobb File
AR-152 11/14/2014 Email Schiller Station Supplemental 308 Response (PDF) (4 pp, 360 K) EPA/Permittee EPA/Permittee
AR-153 11/14/2014 Email Schiller Station Supplemental 308 Response (Emails) (PDF) (4 pp, 339 K) EPA/Permittee EPA/Permittee
AR-154 11/12/2014 Email EPA Request for Redacted Copy of October 2008 Report (PDF) (2 pp, 246 K) EPA/Permittee EPA/Permittee
AR-155 10/30/2014 Email EPA Request for Redacted Copy of October 2008 Report (PDF) (2 pp, 212 K) EPA/Permittee EPA/Permittee
AR-156 11/14/2014 Email EPA Request for Redacted Copy of October 2008 Report (PDF) (4 pp, 344 K) EPA/Permittee EPA/Permittee
AR-157 10/30/2014 Email EPA Request for Redacted Copy of October 2008 Report (PDF) (2 pp, 516 K) EPA/Permittee EPA/Permittee
AR-158 10/28/2014 Email EPA Request for Redacted Copy of October 2008 Report (PDF) (2 pp, 193 K) EPA/Permittee EPA/Permittee
AR-159 11/14/2014 Email EPA Request for Redacted Copy of October 2008 Report (PDF) (2 pp, 249 K) EPA/Permittee EPA/Permittee
AR-160 10/14/2014 Email Provision of Follow-up Submittal to EPA 308 Letter from Enercon that Updates and Supplements the Original Report to Address...Changes (Email, Cover Letter, and Report cover Only) (PDF) (4 pp, 4142 K) Permittee EPA
AR-161 07/17/2014 Email Schiller Station NPDES Permitting Issues (PDF) (6 pp, 615 K) EPA Permittee
AR-162 04/13/2010 Letter Coastal Zone Management Act Federal Consistency Certification for Reissuance of the PSNH Schiller Station National Pollutant Discharge Elimination System Permit (NH0001473) (PDF) (1 pg, 210 K) NH Other Permittee
AR-163 04/02/2014 Email Facility Questions - Tank Farm, Emergency Coal Pile Runoff, and Outfall 001 (PDF) (2 pp, 236 K) Permittee EPA
AR-164 05/02/1986 Letter NPDES Permit No. NH0001473, Schiller Station - Evaluation of PSNH Compliance with Permit (PDF) (14 pp, 1.4 MB) EPA Permittee
AR-165 08/01/2013 Email Response to PSNH Comments of July 31, 2013 Regarding Permits for Stormwater Discharges (PDF) (14 pp, 1.4 MB) EPA Permittee
AR-166 08/07/2015 Facility Effluent Data Schiller Design Flow (PDF) (6 pp, 114 K) Permittee EPA
AR-167 01/14/2012 Other Cost of Outage Shift Data 2014 (PDF) (28 pp, 1.5 MB) Permittee EPA
AR-168 06/01/2010 Ambient Data June Schiller Utilizations for Years 2010-2014 (PDF) (1 pg, 491 K) Permittee EPA
AR-169 01/01/2011 Other Unit 5 Schiller Operating Time 2011 - 2014 (PDF) (2 pp, 496 K) Permittee EPA
AR-170 08/15/2001 Other Exclusion and Survival Rates of Early Life Stages of Fathead Minnows Released Over Inclined Wedge-wire Screens, Department of Fishery and Wildlife Biology, Colorado State University and U.S. Bureau of Reclamation Water Resources Research Laboratory Group (PDF) (21 pp, 2.2 MB) Colorado State University/US Bureau of Reclamation Metro Wastewater Reclamation District, CO
AR-171 03/13/2015 Email Eversource to Sell PSNH Power Plants, Save Customers $300M (Unsourced Newspaper Article dated March 12, 2015) (PDF) (2 pp, 73 K) Other Public
AR-172 02/05/2015 Email PSNH Is Now Eversource Energy (PDF) (3 pp, 100 K) EPA EPA
AR-173 08/05/2013 Technical/ Scientific Paper Evaluation of Fine-mesh Intake Screen System for the Diablo Canyon Power Plant (California) (PDF) (23 pp, 496 K) Tenera Environmental Bechtel Power Corporation JUOTC Project
AR-174 08/19/2013 Email Request for Redacted Copy of PSNH's Response to EPA's Information Request for NPDES Permit Re-Issuance, PSNH Schiller Station (PDF) (1 pg, 77 K) EPA PSNH
AR-175 02/06/2015 Email Updated Semi-annual Schiller Capacity Factors from 2007 to 2014 (PDF) (4 pp, 210 K) John Moskal EPA
AR-176 12/08/2013 Other Power Plant of the Week – Schiller Station (PDF) (4 pp, 570 K) Energy Tariff Experts, LLC Public
AR-177 10/30/2013 Letter Comments of Riverkeeper on NYSDOS Public Notice F-2012-1028, Application of Entergy for Coastal Consistency Certification for the Proposed Relicensing of Indian Point (October 30, 2013), Attachment 1 (PDF) (283 pp, 1.1 MB) Other Entergy
AR-178 07/17/2013 Email Information Previously Requested by EPA (PDF) (8 pp, 1.4 MB) EPA PSNH
AR-179 07/31/2013 Email Schiller Station NPDES Issues (Enercon Report, Fish Return, Circulation Pumps) (PDF) (2 pp, 428 K) PSNH EPA
AR-180 04/02/2013 Email Schiller Questions (308 Letter, Intake Pipe, Intake Flow Volume, Ash Handling, Gunderboom) (PDF) (3 pp, 565 K) PSNH EPA
AR-181 12/01/2007 Technical/ Scientific Paper Fish Protection at Cooling Water Intake Structures: A Technical Reference Manual, 1014934, Technical Update December 2007 (Cover Pages Only) (PDF) (3 pp, 161 K) Electric Power Research Institute Public
AR-182 05/01/2014 EPA Guidance or Policy Technical Development Document for the Final Section 316(b) Existing Facilities Rule, EPA-821-R-14-002, May 2014 (PDF) (372 pp, 7.1 MB) EPA Public
AR-183 10/02/2003 Other Response to Comments for Brayton Point Station NPDES Permit Section 1 (PDF) (10 pp, 63 K) EPA Permittee
AR-184 10/02/2003 Other Response to Comments for Brayton Point Station NPDES Permit Section IV (PDF) (128 pp, 549 K) EPA Permittee
AR-185 07/22/2002 Other Draft Permit Determinations Document for Brayton Point Station NPDES Permit Section 7.0 Cooling Water Intake Requirements and Section 8.0 Final Permit Requirements for Thermal Discharge and Cooling Water Intake (PDF) (187 pp, 1.2 MB) EPA Permittee
AR-186 09/01/2009 Site-specific Technical/ Scientific Study Ecology Trends in the Great Bay Estuary 20 Year Anniversary Report (PDF) (46 pp, 4.6 MB) Great Bay National Estuarine Public
AR-187 05/20/2014 Other – Production Information 316(b) BTA Modified Ristroph Fish Handling Traveling Water Screen (PDF) (2 pp, 176 K) Evoqua Water Technologies (formerly Siemen) Public
AR-188 03/01/1983 Other - Drawing C. T. Main for PSNH Schiller Station Units 4, 5, & 6 Coal Conversion Project P.O. No. 187007, Dwg. No. 56045-20-E-2 (PDF) (1 pg, 136 K) Belco Pollution Control Corporation Permittee
AR-189 04/27/1990 Other - Drawing Schiller Station Overview of Wastewater Treatment Facilities and Details, Portsmouth, NH, NH R-6521-26 (PDF) (1 pg, 98 K) PSNH Engineering Division Permittee
AR-190 05/22/1985 Other - Drawing Schiller Station NPDES Site Plan Dwg. No 024601000_2 (PDF) (1 pg, 107 K) PSNH General Engineering Division Permittee
AR-191 05/22/1985 Other - Drawing NPDES Storm Water Site Plan, Schiller Station, Portsmouth, NH Dwg. No. R-6521-27 (PDF) (4 pp, 450 K) PSNH General Engineering Division Permittee
AR-192 08/10/2015 Letter Review of Draft Permit for PSNH Schiller Station (Permit No. NH 0001473) (PDF) (2 pp, 248 K) NH Fish and Game Department NHDES
AR-193 03/20/1995 Letter Reduction in Schiller Station Lobster Monitoring (PDF) (1 pg, 183 K) NH Fish and Game Department Permittee
AR-194 12/06/1994 Letter Notification of Reduction in Screenwash Monitoring (PDF) (4 pp, 447 K) PSNH Marine Fisheries, NH Fish and Game Department
AR-195 01/14/1997 Letter Resubmitting Another Copy of Impingement Monitoring Procedures dated December 23, 1996, with Missing Sections (cover letter only) (PDF) (7 pp, 678 K) PSNH Environmental Services Marine Fishers, NH Fish and Game Department
AR-196 01/24/1995 Letter PSNH Schiller NPDES Permit No. NH 0001473 Reapplication (Cover Letter Only) (PDF) (1 pg, 183 K) NHDES Water Quality/ Permits and Compliance PSNH
AR-197 07/13/1995 Fax/Memo Revision to Original Storm Water Application for Schiller Station NPDES Permit No. NH 0001473 dated September 30, 1992. Additional Storm Water Outfall E (PDF) (8 pp, 1 MB) PSNH EPA
AR-198 11/08/1995 Letter/ Report Impingement Monitoring Program - Tables of Lobster Impingement, and PSNH Schiller Generating Station Impingement Monitoring Procedures (PDF) (10 pp, 1.2 MB) PSNH NH Fish and Game Department
AR-199 06/28/1996 Letter and Attachment Responses to NHF&G Comments and Questions Letter dated November 20, 1995 and Attachment - Revised PSNH Schiller Generating Station Impingement Monitoring Procedures (PDF) (7 pp, 901 K) PSNH NH Fish and Game Department
AR-200 11/03/1995 Telecon Notes Notes of Conversation between Lou Gilmore and PSNH Allen Palmer on Various Topics including heat, regulations, flow monitoring, Outfall 001A (PDF) (3 pp, 325 K) EPA PSNH
AR-201 11/21/1995 Letter Application - (D08789), R.G. Chavalier to V.C. Harrington dated June 1, 1995, Schiller Station NPDES Permit No. NH 0001473 (PDF) (1 pg, 167 K) PSNH EPA
AR-202 09/30/1994 Letter and Stormwater Application Schiller Station, NPDES Permit No. NH 0001473, Stormwater Application No. NH5000003 (PDF) (4 pp, 708 K) PSNH EPA
AR-203 12/12/1996 Letter and Attachment Impingement Monitoring Procedures for Schiller Generating Station (PDF) (5 pp, 176 K) PSNH Environmental Services Marine Fisheries, NH Fish and Game Department
AR-204 09/03/2015 Web Page Great Bay Resource Protection Partnership Web Page (PDF) (3 pp, 165 K) Great Bay Resource Protection Partnership Public
AR-205 12/01/2007 Technical/ Scientific Paper Fish Protection at Cooling Water Intake Structures: A Technical Reference Manual, EPRI 1014934 (PDF) (35 pp, 5.2 MB) Electric Power Research Institute (EPRI) Public
AR-206 09/01/2005 Technical/ Scientific Paper EPRI Laboratory Study 2003, Relative Importance of Various Screen Design Parameters (Excerpt) (PDF) (4 pp, 819 K) Electric Power Research Institute (EPRI) Public
AR-207 01/01/2007 Technical/ Scientific Paper Evaluation of a Cylindrical Wedge-Wire Screen System at Beal Lake, Arizona, 2006 (PDF) (54 pp, 6.9 MB) U.S. Department of Interior/ Normandeau Associates Beal Lake Project
AR-208 01/01/1979
(est)
Technical/ Scientific Paper A Biological Evaluation of Devices Used for Reducing Entrainment and Impingement Losses at Thermal Power Plants (Excerpts) (PDF) (5 pp, 676 K) Oak Ridge National Laboratory/ EPA Region 2/ DOE-UC Public
AR-209 05/01/2003 Technical/ Scientific Paper Laboratory Evaluation of Wedgewire Screens for Protecting Early Life Stages of Fish at Cooling Water Intakes (PDF) (118 pp, 16.5 MB) Electric Power Research Institute (EPRI) Public
AR-210 09/01/2000 Technical/ Scientific Paper Fish Survival on Fine Mesh Traveling Screens (PDF) (8 pp, 436 K) J. McLaren, L. Tuttle, Jr. Public
AR-211 01/01/1999 Technical/ Scientific Paper Ecosystem Services Generated by Fish Populations (PDF) (16 pp, 238 K) C. Holmlund, M. Hammer Public
AR-212 11/03/2006 Technical/ Scientific Paper Impacts of Biodiversity Loss On Ocean Ecosystem Services (PDF) (5 pp, 316 K) B. Worm, E. Barbier, et al Public
AR-213 06/17/2009 Technical/ Scientific Paper Economics of Biodiversity and Sustainable Fisheries Management (PDF) (5 pp, 316 K) Wisdom Akpalu Public
AR-214 08/14/2009 Permittee Report July 2009 Monthly NPDES Discharge Monitoring Report (PDF) (15 pp, 2.6 MB) Permittee EPA
AR-215 09/14/2009 Permittee Report August 2009 Schiller Station Monthly NPDES Discharge Monitoring Report (PDF) (14 pp, 2.4 MB) Permittee EPA
AR-216 10/08/2009 Permittee Report September 2009 Monthly NPDES Discharge Monitoring Report (PDF) (15 pp, 2.5 MB) Permittee EPA
AR-217 11/13/2009 Permittee Report October 2009 Monthly NPDES Discharge Monitoring Report (PDF) (17 pp, 2.9 MB) Permittee EPA
AR-218 12/20/2009 Permittee Report November 2009 Monthly NPDES Discharge Monitoring Report (PDF) (17 pp, 2.9 MB) Permittee EPA
AR-219 01/15/2010 Permittee Report December 2009 Monthly NPDES Discharge Monitoring Report (PDF) (17 pp, 2.8 MB) Permittee EPA
AR-220 02/12/2010 Permittee Report January 2010 Monthly NPDES Discharge Monitoring Report (PDF) (17 pp, 2.9 MB) Permittee EPA
AR-221 08/01/2006 Other Schiller Station Quality Assurance Plan and Standard Operating Procedures for Impingement Monitoring, Revision 0 August 2006 (PDF) (54 pp, 8 MB) Normandeau Associates, Inc. Permittee
AR-222 08/01/2006 Other Schiller Station Quality Assurance Plan and Standard Operating Procedures for Entrainment Monitoring, Revision 0 August 2006 (PDF) (81 pp, 12.6 MB) Normandeau Associates, Inc. Permittee
AR-223 11/14/1952 Other - Drawing Schiller Station Site Plan and Location of Existing Utilities, Drawing No. 9900-1 (PDF) (1 pg, 129 K) PSNH Public
AR-224 04/04/1951 Other - Drawing Screen House Substructure Concrete Outline - Plans and Subsections, Record Number 4592 592-B-3 (PDF) (1 pg, 129 K) PSNH Public
AR-225 06/21/1948 Other - Drawing Details of Intake Pipes Screen House, Portsmouth Steam Plan, Public Service Company of New Hampshire, Drawing Number 544-36 (PDF) (2 pp, 207 K) NEPSCO Services, Inc. Permittee
AR-226 04/24/1951 Other - Drawing Screen House, Miscellaneous Steel, Schiller Station, Portsmouth, NH (PDF) (5 pp, 615 K) Jackson and Moreland Engineers Permittee
AR-227 10/01/2014 Site-specific Technical/ Scientific Study Engineering Response Supplement to United States Environmental Protection Agency CWA §308 Letter, PSNH Schiller Station, Portsmouth, New Hampshire, October 2014, Redacted (PDF) (85 pp, 3.6 MB) Enercon Services, Inc. for PSNH EPA
AR-228 10/06/2006 Other Schiller Station NPDES Permit No. NH 0001473, Proposal for Information Collection, Referencing Letter (C12521), Linda Murphy to John MacDonald dated December 30, 2004 (Cover Letter Only - Hard Copy Proposal is CBI and in Secure EPA File with Original Cover Letter) (PDF) (1 pg, 148 K) PSNH EPA
AR-229 07/31/2014 Email Schiller Station NPDES Issues (PDF) (6 pp, 929 K) EPA/PSNH EPA/PSNH
AR-230 03/05/2013 Email Fish Are Safe (PDF) (1 pg, 64 K) EPA EPA
AR-231 05/05/2014 Other Industrial Screen Products Web Page, Water Intake Screen Selection (PDF) (3 pp, 373 K) www.wedgewire.com Public
AR-232 02/27/2013 Email Schiller Station Information Request - (308 Response Letter, Intake Pipe Dimension, Total Daily Intake Flow, Ash Handling System, Intake Pump, Maintenance Costs, Gunderboom Aquatic Microfiltration Barriers Evaluation) (PDF) (1 pg, 193 K) EPA PSNH
AR-233 01/01/2014 PowerPoint Presentation The Marine Living Resources of the Piscataqua River, Bruce W. Smith, New Hampshire Fish and Game Department (PDF) (14 pp, 1.9 MB) NH Fish and Game Public
AR-234 10/01/1992 Other – Book The Ecology of the Great Bay Estuary, New Hampshire and Maine: An Estuarine Profile and Bibliography (PDF) (2 pp, 271 K) Frederick Short, Ed., UNH, Jackson Estuarine Laboratory Public
AR-235 07/28/2014 Email Cover Email for Transmittal of Comprehensive Cost Summary sheet, Schiller, Version 18 (Cost Summary Sheet is CBI and Not Provided) (PDF) (1 pg, 152 K) EPA-Erik Beck EPA-Sharon DeMeo
AR-236 08/01/2003 Other Response to Environmental Protection Agency's Information Request for NPDES Permit Reissuance, PSNH Schiller Station, Portsmouth, NH, August 2013, Redacted (PDF) (21 pp, 701 K) PSNH by Enercon EPA
AR-237 01/05/2013 Email Request and Response regarding August 19, 2013 Report, "Response to EPA's Information Request for NPDES Permit Re-issuance, PSNH Schiller Station, Portsmouth, NH" Prepared by Enercon Services (Email Only) (PDF) (1 pg, 43 K) EPA/PSNH PSNH/EPA
AR-238 12/10/2004 Email Transmittal of Schiller Station 2008 Enercon Report (Report is in AR-140) (PDF) (1 pg, 73 K) NU/EPA EPA/NU
AR-239 06/01/2015 Email Provision of Schiller RAI Response Privileged and Confidential August 2013 Redacted (Response is in AR-236) (PDF) (1 pg, 736 K) PSNH/EPA EPA/PSNH
AR-240 01/05/2015 Email Schiller Report 2008 Reactions (PDF) (1 pg, 47 K) PSNH/EPA PSNH/EPA
AR-241 12/09/2014 Email Schiller PSNH 308 Response Final Reacted (Redacted document is in AR-140. Attachments are CBI and not included.) (PDF) (1 pg, 2.7 MB) PSNH EPA
AR-242 11/26/2014 Email Schiller 308 Response Supplement Reacted (Cover Email only) (PDF) (1 pg, 3.3 MB) NU EPA
AR-243 06/03/2015 Email Thanks and Apology for Delay (PDF) (1 pg, 27 K) Eversource EPA
AR-244 07/18/2014 Other Schiller Design Flow July 18, 2014 (PDF) (6 pp, 601 K) EPA – Phil Colaruso EPA
AR-245 01/01/1972 Report Water Quality Criteria, 1972: A Report of the Committee on Water Quality, National Research Council, U.S. Committee on Water Quality Criteria, United States National Technical Advisory Committee on Water Quality Criteria (PDF) (2 pp, 769 K) U.S. National Technical Advisory Committee Public
AR-246 12/17/2007 Order US EPA Region 1 - Findings and Order for Compliance Docket No. 08-007 In the Matter of Dominion Energy Brayton Point LLC, Brayton Point Power Station, NPDES Permit No MA 0003654 December 17, 2007 (PDF) (33 pp, 1.1 MB) EPA Dominion Energy
AR-247 10/01/2006 Proposal Schiller Station NPDES Permit NH 0001473, Proposal for Information Collection PSNH EPA
AR-248 10/01/2008 Other Response to United States Environmental Protection Agency CWA §308 Letter, PSNH Schiller Station, Portsmouth, New Hampshire, October 2008 CBI PSNH EPA
AR-249 10/01/2014 Other Engineering Response Supplement to United States Environmental Protection Agency CWA §308 Letter, PSNH Schiller Station, Portsmouth, New Hampshire, October 2014 CBI PSNH EPA
AR-250 08/01/2013 Other Response to Environmental Protection Agency's Information Request for NPDES Permit Reissuance, PSNH Schiller Station, Portsmouth, NH, August 2013, CBI PSNH EPA
AR-251 01/01/2002 Book Bigelow and Schroeder's Fishes of the Gulf of Maine, edited by Bruce B. Collettee and Grace Klein MacPhee, Third Edition, Smithsonian Institution Press, Washington and London, 2002 (PDF) (1 pgp, 119 K) Bigelow and Schroeder Public
AR-252 09/24/2011 Email Dover, NH Outfall Plume (PDF) (4 pp, 1.2 MB) NOAA EPA
AR-253 01/01/1972 Report Environmental Protection Research Catalog, Part 1, prepared by Smithsonian Science Information Exchange for EPA Office of Research and Monitoring, Research Information Division, Washington, D.C., 1972 (PDF) (1 pg, 110 K) Smithsonian Science Information Exchange Public
AR-254 01/01/1990 Report Ecological Effects of Thermal Discharges, T.E.L. Langford, Elsvier Applied Sciences, New York City, 1990 (PDF) (2 pp, 272 K) T. Langford Public
AR-255 04/19/1976 Report Proceedings of the Conference on Environmental Monitoring and Simulation, EPA Office of Research and Development, EPA Office of Planning and Management, April 19-22, 1976 (PDF) (1 pg, 104 K) EPA Public
AR-256 01/01/1978 Report Power Plant Entrainment: A Biological Assessment, edited by J. R. Schubel, Academic Press, Inc. New York City, 1978 (PDF) (8 pp, 1.2 MB) J. R. Schubel, editor Public
AR-302 05/01/2005 Technical / Scientific Paper Field Evaluation of Wedgewire Screens for Protecting Early Life States of Fish at Cooling Water Intakes, 1010112, Final Report, May 2005 (PDF) (130 pp, 2.3 MB) D. Dixon, EPRI Public
AR-303 09/01/2011 Site-specific Technical Study scwd2 Seawater Desalination Intake Technical Feasibility Study Prepared for scwd2 Desalination Program, Santa Cruz, CA 2011 (PDF) (264 pp, 13.2 MB) Kennedy/Jenks Consultants scwd2
AR-304 10/20/2015 Other Draft Permit Public Notice, NPDES No. NH0001473, PSNH Schiller Station, Request for Extension of Public Notice Period by 60 Days to January 27, 2016 (PDF) (2 pp, 370 K) PSNH dba Eversource Energy EPA
AR-305 10/28/2015 Other Draft Permit Public Notice Extension, NPDES No. NH 0001473, PSNH Schiller Station Cover Letter Only (PDF) (2 pp, 201 K) EPA – David Webster PSNH dba Eversource Energy
AR-306 10/30/2015 Other Notice of Extension of Public Comment Period (PDF) (2 pp, 432 K) EPA PSNH dba Eversource Energy
AR-307 10/30/2015 Other Draft Authorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES) (PDF) (30 pp, 5.2 MB) EPA PSNH dba Eversource Energy
AR-308 10/29/2015 Email Extension of Comment Period for Schiller Station – Email Only (PDF) (1 pg, 71 K) EPA Not specified
AR-309 08/07/2013 Letter Description of 1990 Thermal Limits, Summary of EPA's Thermal Study at Schiller, and Proposed Thermal Limits in the Draft Permit (PDF) (5 pp, 735 K) EPA NHDES
AR-310 11/19/2015 Letter Reissuance of the NPDES Permit for the Schiller Station Electric Generating Facility, Portsmouth, NH, Permit No. NH0001473-Essential Fish Habitat (with Attachment EFH Assessment) (PDF) (12 pp, 2.4 MB) EPA National Marine Fisheries Service
AR-311 01/27/2016 Letter Comment on Draft National Pollutant Discharge Elimination System (NPDES) Permit. No, NH0001743 for Public Service Company of New Hampshire's (PSNH) Schiller Station (PDF) (6 pp, 220 K) Conservation Law Foundation (CLF) EPA
AR-312 01/27/2016 Letter Comments of Sierra Club Regarding Renewal of Schiller Station NPDES Permit No. NH0001473 (PDF) (201 pp, 5.1 MB) Super Law Group for Sierra Club EPA
AR-313 01/27/2016 Letter Comments of Public Service Company of New Hampshire on EPA's Draft National Pollutant Discharge Elimination System Permit No. NH0001473 (PDF) (413 pp, 7.2 MB) PSNH dba Eversource Energy EPA

Top of Page

Area Navigation

Jump to main content.