Clean Harbors Los Angeles, LLC — Selected Documents
      
      
	
     You will need Adobe Reader to view some of the files on this page. See 
EPA's PDF page to learn more about PDF, and for a link to the free Adobe Reader. 
Selected Documents, Clean Harbors Los Angeles, LLC 
  
    | Public Notice | Date | 
 
    | Public Notice (English/Español) (PDF) (1 pp, 196K) | August 2013 | 
   
    | Public Notice
    With Informational Fact Sheet | Date | 
 
    | Request for Public Comment on Renewal Approval (PDF) (4 pp, 339K)Solicita Comentarios Sobre la Aprobación de la Renovación Propuesta  (Español) (PDF) (2 pp, 392K)
 | August 2013 | 
  
    | Informational Fact Sheet | Date | 
  
    | Informational  Community Fact Sheet (English) (PDF) (4 pp, 646K)Hoya Informativa a la  Comunidad (Español) (PDF) (4 pp, 782K)
 | October 2012 | 
  
   
    | Final Permit | Date | 
 
    | Final TSCA Approval (PDF) (41 pp, 970K)All Proposed Approval appendices may be provided upon request
 Appendix A – TSCA Application (Section below)
 Appendix B – 1997 TSCA Approval
 Appendix C – RCRA Part "B" Application
 Appendix D – TSCA inspection Reports
 Appendix E – Endangered Species Act Determination
 Appendix F – National Historic Preservation Act Determination
 Appendix G – Approval Modification Classifications
 | October 2013 | 
 
   | Statement of Basis (PDF) (19 pp,400k)All Statement of Basis appendices may be provided upon request
 Appendix A – Justification For Use Of Omnibus Provisions
 Appendix B – U.S. EPA Endangered Species Act Determination
 Appendix C – U.S. EPA National Historic Preservation Act Determination
 Appendix D – U.S. EPA Region 9 Environmental Justice and Permitting  Implementation Plan
 | October 2013 | 
  
    | Administrative Record Index (8 pp, 38k) | October 2013 | 
  
  
  
    | Application for PCB Storage | Date | 
  
  
    | TSCA Permit Application (PDF) (84 pp, 2.38M)Appendix A – Personnel Resumes (Not included)
 Appendix B – Facility Drawing (PDF) (1 pp, 55kK)
 Appendix C – Inspection Forms (Not included)
 Appendix D – Spill Prevention Control and Countermeasures (PDF) (27 pp, 311k)
 Appendix E – Secondary Containment Calculations (PDF) (3 pp, 108k)
 Appendix F – Epoxy Material Data and Safety Sheets (Not included)
 Appendix G – Onsite Laboratory Standard Operating Procedure (PDF) (4 pp, 67k)
 Appendix H – PCB Handling Standard Operating Procedure (PDF) (24 pp, 758k)
 Appendix I – External Laboratory QA/QC (Not included)
 Appendix J – Financial Assurance Documents (Not included)
 Appendix K – EPA Guidance for Core Sampling (PDF) (15 pp, 889K)
 Appendix L – Facility SOP on Random Wipe Sampling (PDF) (6 pp, 99K)
 Appendix M – Closure of Containment Bay E (PDF) (9 pp, 355K)
 | June 2012 | 
 
  
    | Facility Inspection Reports | Date | 
  
    | 2004 Inspection Report (PDF) (28 pp, 2.65M) | 10/2004 | 
  
    | 2007 Notice of Noncompliance (PDF) (2 pp, 165k) | 9/2007 | 
  
    | 2009 Inspection    Report (PDF) (19 pp, 1.42M) 2011 Notice of Noncompliance for 2009 Inspection (PDF) (2 pp, 203k)
 | 7/2009 3/2011
 | 
  
    | 2011 Notice of Noncompliance (PDF) (2 pp, 108k) 2011 Inspection Report (PDF) (56 pp, 4.26M)
 | 10/2011 10/2011
 | 
  Top of page