Additional documents related to the Red Hill Administrative Order on Consent (AOC) Statement of Work (SOW) Section 2.0: Tank Inspection, Repair & Maintenance.
You will need Adobe Reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
Revised Draft Tank Inspection, Repair, and Maintenance (TIRM) Outline 23 March, 2016 (PDF)(27 pp, 216 K,
03/23/2016)
Revised Draft Tank Inspection, Repair, and Maintenance (TIRM) Outline (Pre-Decisional, Do Not Cite or Quote, For Discussion Purposes Only) - March 23, 2016
-
Navy Concurrence on Closing Scoping for AOC SOW Sections 2 and 3 - June 23 2016 (PDF)(1 pg, 64 K,
06/23/2016)
Letter from Department of the Navy: Commander, Navy Region Hawaii - SUBJECT: SCOPING COMPLETE OF SECTION 2.1 AND 3.1 OF THE ADMINISTRATIVE ORDER ON CONSENT AND STATEMENT OF WORK HAVE BEEN MET
-
EPA and DOH Completion of Scoping for Red Hill AOC SOW Sections 2.1 and 3.1 - June 10 2016 (PDF)(1 pg, 92 K,
06/10/2016)
Letter from EPA Region 9 and State of Hawaii Department of James A. K. Miyamoto, P.E. Deputy Operations Officer Naval Facilities Engineering Command, Joint Base Pearl Harbor Re: Completion of Scoping Phase of Sections 2 and 3 of Red Hill Administrative Order on Consent (AOC)
-
Honolulu Board of Water Supply Comments on AOC SOW Sections 2, 3, 4, 5 and 8 - May 27 2016 (PDF)(22 pp, 3 MB,
05/27/2016)
Honolulu Board of Water Supply (BWS) Comments on work plans being developed under the Red Hill Bulk Fuel Storage Facility Administrative Order on Consent (AOC) Statement of Work (SOW) Sections 2 through 5 and 8
-
Regulatory Agency Comment Letter on 29 January 2016 TIRM Outline, April 5 2016 (PDF)(6 pp, 3 MB,
04/05/2016)
EPA and State of Hawaii DOH letter to the U.S. Department of the Navy and Defense Logistics Agency to clarify expectations for the Tank Inspection, Repair and Maintenance ("TIRM") Report required under Section 2.2 of the Red Hill AOC SOW.
-
Draft Tank Inspection, Repair, and Maintenance (TIRM) Outline - January 29 2016 (PDF)(50 pp, 579 K,
01/29/2016)
Draft Tank Inspection, Repair, and Maintenance Report Outline (Draft, Predecisional, for Discussion Purposes Only, Do Not Cite or Quote)
-
Draft 2nd Scoping Meeting Summaries - December 18 2015 (PDF)(31 pp, 165 K,
12/18/2015)
Red Hill Administrative Order of Consent Scoping Meetings Summaries
-
Kickoff Agenda 2nd Scoping Meeting - November 27 2015 (PDF)(2 pp, 63 K,
11/27/2015)
Red Hill Administrative Order of Consent Scoping Meetings #2 (30 Nov-4 Dec) - Kick-Off Agenda
-
Red Hill 2nd Scoping Meeting Section 2 Agenda Final - November 24 2015 (PDF)(4 pp, 41 K,
11/30/2015)
Red Hill SOW Section 2 - Tank Inspection, Repair, Maintenance (TIRM) Scoping Meeting AGENDA
-
Cover Memo Regulatory Agency Comments on Initial TIRM Report Outline - November 19 2015 (PDF)(1 pg, 49 K,
11/19/2015)
U.S. EPA and DOH Comments on Red Hill SOW Submittals for Sections 2.2, 4.2, 5.1
-
Regulatory Agency Comments on Initial TIRM Outline - November 19 2015 (PDF)(6 pp, 290 K,
11/19/2015)
Current Systems Reports - Outline Comments: Red Hill Fuel Storage Facility
-
Red Hill AOC Initial Scoping Meeting Summaries - November 6 2015 (PDF)(33 pp, 580 K,
10/26/2015)
Red Hill Administrative Order of Consent Scoping Meetings Overview and Kick Off Meeting Minutes
-
Initial Outline of TIRM Report - October 27 2015 (PDF)(2 pp, 30 K,
10/26/2015)
Initial Outline of Tank Inspection, Repair, and Maintenance Report
-
Red Hill AOC Initial Scoping Meeting Agendas - October 23 2015 (PDF)(7 pp, 80 K,
10/23/2015)
Red Hill Administrative Order of Consent Scoping Meetings Agenda - October 26/27, 2015