Red Hill

October 2016 TIRM Report List of Appendices

Appendices to the October 11, 2016 Red Hill AOC SOW TIRM Report

 

PLEASE READ: Most of the PDF's below are extremely large files. For best results,
right-click the PDF link and select "Save link as...", then save to your desktop.
You will need Adobe Reader to view some of the files on this page.
See EPA’s About PDF page to learn more.

 

List of Appendices: Red Hill AOC SOW TIRM Report

  • A: Telltale Piping Holes
  • B: Red Hill Dome Truss Scaffold
  • C: Red Hill Monorail Scaffold
  • D: Boom and Basket System
  • E: API 653 Inspection Report Tank 13 July 1995
  • F: API 653 Inspection Report Tank 10 1998
  • G: API 653 Report Tank 7 1998
  • H: API 653 Report Tank 8 1998
  • I: Contract Number FA8903-04-D-8681-0176-All

Appendix J: Tank 16 API 653 Final Inspection Report 2007 (PDF)(659 pp, 85.6 MB, About PDF)

Appendix K: API 653 Inspection Tank 6 2007 (PDF)(719 pp, 82 MB, About PDF)

Appendix L: API 653 Inspection Tank 15 2007 (PDF)(496 pp, 74.6 MB, About PDF)

  • M: Contract Number N47408-04-D-8503-0031-All
  • N: API 653 Inspection Tank 2 2008
  • O: API 653 Inspection Tank 20 2008
  • P: Contract Number N62583-09-D-0132-0003-All
  • Q: WGS Daily Production Report Tanks 5 and 17

R: WGS Tanks 5 and 17 Work Plan (rev0 24 May 2010) (PDF)(248 pp, 39.2 MB, About PDF)

S: WGS RFI6 Pressure Washing (PDF)(1 pp, 87 K, About PDF)

T: WGS Inspection Report Rev E (PDF)(591 pp, 105.4 MB, About PDF)

  • U: CSI Services – Daily Coating Inspection Report
  • V: WGS Work Plan – Abrasive Blasting and Surface Preparation 2012
  • W: WGS Warranty Work Plan
  • X: NAVFAC Drawing No. 7019545 MILCON P-060 coating details

Y: Not Used

Z: Not Used

  • AA: WGS Analysis Hydro Report
  • AB: WGS Redhill Complex TK 5 Project – Pressure Test Log
  • AC: Willbros D0132 DO 3 Red Hill mod 9
  • AD: WGS ASNT Records
  • AE: Tank 5 Inspection Checklist
  • AF: FY-78 MILCON P-060 Scope of Work
  • AG: WGS Weld WPS and PQR
  • AH: WGS WPQ Records
  • AI: WGS Daily Report 01-16-13 Rev 0
  • AJ: Tank 5 Warranty notice
  • AK: Notice to Proceed Oct 2014
  • AL: TK 5 Visual Inspection Report Signed
  • AM: TK 5 MT-LT Inspection Report
  • AN: WGS Tank 5 Work Plan Appendix M
  • AO: WGS Free Product Report
  • AP: WGS Tank 5 Pressure Testing Procedure Jun 2014
  • AQ: WGS Tank 5 Pressure Testing Report Jun 2014
  • AR: QASP RHT5 Warranty Rework
  • AS: WGS Tank 5 Suitability For Service Statement

AT: WGS Repair Work Plan Red Hill Tank 5 (PDF)(247 pp, 72.4 MB, About PDF)

  • AU: WGS D-0132 Basic Award (PDF)
  • AV: WGS Sample and Drain Line Drawings (PDF)
  • AW: WGS Tank 5 Repairs – Repair NDE QC Data
  • AX: List of Welder PQR
  • AY: API Inspector Qualifications
  • AZ: NAVSUP GLS Instruction 10345.1 – Fuel Tank Return to Service
  • BA: Contract Number N62742-03-C-1402-All
  • BB: Red Hill Tank 5 Inspection SOW
  • BC: Generic 653 SOW April2010
  • BD: UFGS Section 33 56 17.00 20
  • BE: UFGS Section 33 56 18.00 20
  • BF: Telltale Leak Detection System
  • BG: DLA ATG Policy Letter 2009
  • BH: NAVSEA 5104 14 August 2011 RSO Application
  • BI: NAVFACINST 5104 1
  • BJ: Report on the Trip to Pacific Division Naval Facilities Command
  • BK: Acquisition Schedule Red Hill CIR
  • BL: Overall CIR Schedule without modification
  • BM: Red Hill Tank CIR Contract Sequencing
  • BN: Contract Number N39430-15-D-1632-0005 Tanks 14, 17, 18
  • BO: Contract Number N39430-15-D-1632-0004 Tanks 4, 13
  • BP: NAVFAC Drawing No. 7019544 MILCON P-060
You will need Adobe Reader to view some of the files on this page. See EPA’s About PDF page to learn more.