Class III In-Situ Production of Copper
Permit No. R9UIC-AZ3-FY11-1
Documents related to the final Class III Underground Injection Control Area Permit for Florence Copper, Inc. (FCI) - Florence, AZ.
For additional documents related to this permit, search the EPA archive.
You will need Adobe Reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
NOTICE OF FINAL PERMIT DECISION - Issuance of the Class III In-Situ Production of Copper Permit No. R9UIC-AZ3-FY11-1 For the Florence Copper Production Test Facility (PTF) (PDF)(2 pp, 58 K,
12/20/2016)
The United States Environmental Protection Agency, Region 9 (EPA) is issuing a Class III Underground Injection Control (UlC) Permit, No. R9UlC-AZ3-FY 11-1, to Florence Copper, lnc. for an In-Situ Copper Production Test Facility (PTF).
-
UIC Area Permit No. R9UIC-AZ3-FY11-1: Class III In-Situ Production of Copper - Florence Copper, Inc. (PDF)(46 pp, 333 K,
12/20/2016)
UIC Area Permit authorizing Florence Copper, Inc. to construct and operate a Class III injection well Production Test Facility (PTF) and engage in in-situ copper recovery (ISCR) operations at the Florence Copper Project (FCP).
-
APPENDIX A: Project Maps, Aquifer Exemption Delineation, and Well Locations (PDF)(12 pp, 7 MB,
11/18/2014)
Appendix A to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX B: Proposed Well Construction Procedures and Diagrams (PDF)(27 pp, 2 MB,
11/18/2014)
Appendix B to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX C: Plugging and Abandonment Plan (PDF)(87 pp, 20 MB,
11/18/2014)
Appendix C to the UIC Permit Application for Florence Copper, Inc.
-
Appendix D: Geophysical Logging Requirements (PDF)(1 pg, 62 K,
11/18/2014)
Appendix D to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX E: Operations Plan (PDF)(16 pp, 391 K,
11/18/2014)
Appendix E to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX F: Closure and Post-Closure Plans (PDF)(124 pp, 4 MB,
11/18/2014)
Appendix F to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX G: Memorandum of Agreement on Historical Preservation (PDF)(23 pp, 821 K,
10/16/2015)
Memoranda of Agreement among the U.S. EPA, Region 9, Arizona State Historic Preservation Officer, Advisory Council on Historic Preservation, Arizona State Land Departement, and Florence Copper, Inc. for the Florence Copper Production Test Facility
-
APPENDIX H: Wildlife Monitoring Plan (PDF)(3 pp, 1 MB,
11/18/2014)
Appendix H to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX I: EPA Reporting Forms (PDF)(1 pg, 128 K,
11/18/2014)
Appendix I to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX J: Region 9 Step Rate Test Policy (PDF)(1 pg, 34 K,
11/18/2014)
Appendix J to the UIC Permit Application for Florence Copper, Inc.
-
APPENDIX K: Groundwater Quality Alert Levels and Compliance Monitoring (PDF)(16 pp, 847 K,
11/18/2014)
Appendix K to the UIC Permit Application for Florence Copper, Inc.
-
Response to Comments: Florence Copper Production Test Facility (PDF)(48 pp, 564 K,
12/20/2016)
Response to comments submitted during the public comment period on the Florence Copper Production Test Facility (PTF) Class III In-Situ Production of Copper Permit No. R9UIC-AZ3-FY11-1 [PTF Permit].
-
Response to Comments: NHPA Section 106 Consultation proposed Florence Copper Project Production Test Facility (PDF)(7 pp, 295 K,
10/16/2015)
[Please note that this document contains redline and strikeout text. This was intentionally done to illustrate the changes proposed to the permit by the public.] Response to comments submitted during the public comment period on the EPA’s Draft Class III Underground Injection Control (UIC) Area Permit (Draft Permit) and the Section 106 process of National Historic Preservation Act (NHPA) for the Proposed Florence Copper Project Production Test Facility (PTF).