Pilot Project to Optimize Superfund-financed Pump and Treat Systems: Summary Report and Lessons Learned

This report summarizes Phase II (site optimization) of the Nationwide Fund-lead Pump and Treat Optimization Project. This phase included conducting Remediation System Evaluations (RSEs) at each of the 20 sites selected in Phase I with the purpose of providing recommendations to improve remedy effectiveness, reduce remedy costs, improve technical operations, and gain site closeout. RSEs at four of the 20 P&T systems (two in Region 4 and two in Region 5) were previously conducted as part of a demonstration project completed in 2000.