Hazardous Waste Cleanup: Invensys Compliance Controls Site in New Stanton, Pennsylvania

On this page:


Cleanup Status

The Human Health and Ecological Risk Assessment was approved by Pensylvania Department of Environmental Protection (PADEP) in June 2015. A cleanup plan is anticipated to be submitted in the near future that will outline a remedial approach, which will likely include optimization of the soil vapor extraction system, bioremediation in the source area and several aquifers/geological units downgradient of the source area, and a significant expansion of phytoremediation to cover over five acres of the hydraulically downgradient extent of the facility.

The Remedial Investigation addressing chlorinated solvent contamination at the facility was submitted in October 2011 and approved in December 2011. Soil contamination is generally limited to source areas, the majority of which have been removed. The soil vapor extraction system continues to extract volatile contaminants from the primary source area. Groundwater contamination is more widespread and several options for cleanup are being assessed. A 56-tree phytoremediation plot was planted between the main source area and the eastern property boundary in 2012 to help contain and treat contaminated groundwater. Three bioremediation pilot tests were also conducted at the facility in 2014 that were mostly successful in degrading contaminants in groundwater.

 Cleanup History

Remedial investigations and cleanup of the facility began soon after plant closure in 2000, and the facility entered the Act 2 Program in February 2001. The Final Report addressing the impacts from mercury contamination to the facility was approved in April 2011. The Final Report included an environmental covenant that codified restrictions on groundwater and land use at the facility, in addition to containing a Soil Management Plan for any necessary future land disturbances. Remedial measures addressing volatile contaminants are ongoing.

Top of Page


Site Description

Interactive map of Invensys Compliance Controls Site, New Stanton PA

View larger map

The former Robertshaw facility was constructed between 1959 and 1960 on a 193-acre plot of land in New Stanton, Pennsylvania.  The facility manufactured various controls for residential and commercial appliances including electric and gas thermostats for ranges and water heaters, pressure switches and regulators, valves, timers, sensors, and other miscellaneous components.  The facility has been operated by Siebe Appliance Controls and is currently owned by Invensys Appliance Controls, who purchased the facility from Robertshaw in 2000. Appliance control manufacturing operations have been inactive since January 2000. Westinghouse currently leases a majority of the facility and has occupied a portion of it since 2000.

Top of Page


Contaminants at this Facility

Primary contaminants at the facility include chlorinated volatile organic compounds including trichloroethene and trichloroethane and their degradation products, in addition to tetrachloroethene and mercury.  Groundwater, soil, and sediment at the facility are known to be contaminated; however, exposures to these media are limited to intrusive activities typically conducted by personnel using appropriate protective measures.  Groundwater is not used as a drinking water source in the vicinity of the facility. The potential for vapor intrusion into facility buildings is currently mitigated through the use of the soil vapor extraction system.

Top of Page


Institutional and Engineering Controls at this Facility

Institutional controls will be determined at the time of remedy selection.

Top of Page


Land Reuse Information at this Facility

The facility has been reused primarily as warehousing space; Westinghouse presently leases a majority of the facility.

Top of Page


Site Responsibility at this Facility

Resource Conservation and Recovery Act (RCRA) Corrective Action activities at this facility have been conducted under the direction of EPA Region 3 with assistance from PA DEP.