Region 4 Virtual Reading Room - LCP Chemicals Site, Brunswick, GA
2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 1997 | 1995
2016
- July 14, 2016 CO2 Sparging Phase 3 Full Scale Implementation and Monitoring Report, LCP Chemicals Site, Brunswick, GA, Prepared for Honeywell
2015
- September 2015 Record of Decision, LCP Chemicals Site. Operable Unit 1 - Mash, Brunswick, Glynn County, Georgia
- June 19, 2015 CO2 Sparging Phase 2 Full Scale Implementation and Monitoring Report for the LCP Chemicals Site, Brunswick, Georgia (DRAFT)
2014
- December 4, 2014 Public Meeting Presentation, Brunswick-Glynn County Library
- November 2014 Superfund Proposed Plan, City of Brunswick, Glynn County, Georgia
- November 2014 Proposed Plan Summary, Brunswick, GA
- September 12, 2014 Letter from Jan B. Rogers, EPA
- September 11, 2014 Technical Memorandum for Phase 2 CO2 Sparging
- June 20, 2014 CO2 Sparging Phase 1, Full Scale Implementation and Monitoring Report
- June 2, 2014 Feasibility Study, Brunswick, Georgia
- June 2, 2014 Letter from Prashant Gupta, Honeywell, to Galo Jackson, EPA. Subject: Responses to EPA Comments on the October 2013 Draft Feasibility Study Report
- May 1, 2014 Letter from Galo Jackson, EPA, to Prashant Gupta, Honeywell, LCP Chemicals Superfund Site Feasibility Study Reort, Brunswick, Glynn County, Georgia
2013
- October 18, 2013 Draft Feasibility Study, LCP Chemical Superfund Site, Operable Unit No. 1 (Estuary), Brunswick, Georgia
- October 16, 2013 Letter From Prashant Gupta, Honeywell to Galo Jackson, USEPA, Subject: Draft Feasibility Study Report for OU1 (Estuary)
- July 18, 2013 Technical Memo From Richard Carbonaro and Robert Mutch, Mutch Associates to Addressees Subject: CO2 Sparging Proof of Concept - 6 Month Post-Sparge Monitoring Results
- June 20, 2013 Letter From Galo Jackson, USEPA to Prashant Guta, Honeywell, Subject: Comments on the Draft Feasibility Study Report for the Estuary, Operable Unit One
- April 24, 2013 CO2 Sparging Work Plan, LCP Chemicals Site, Brunswick, Georgia (FINAL)
- April 15, 2013 Letter From Prashant Gupta, Honeywell to Galo Jackson, USEPA, Subject: OU3 Feasibility Study Technical Memorandum (Draft)
- April 1, 2013 CO2 Sparging Proof of Concept Test Report, Revision 1, LCP Chemicals Site, Brunswick, Georgia
- March 29, 2013 Letter From Prashant Gupta, Honeywell to Galo Jackson, USEPA, Subject: Draft Feasibility Study Report for OU1 (Estuary), LCP Chemicals Site
- February 2013 Remedial Investigation Report Operable Unit 3 - Upland Soils, LCP Chemicals Site, Brunswick, Georgia (FINAL)
- February 26, 2013 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Subject: EPA's Approval of the February 2013 Revision of the Remedial Investigation Report for the Uplands, Operable Unit 3
- January 23, 2013 Letter From Prashant Gupta, Honeywell to Galo Jackson, USEPA, Subject: PRP's Response to EPA's Letter Dated January 3, 2013, Final Comments on November 2012 Draft Remedial Investigation for Operable Unit 3 - Upland Soils
- January 3, 2013 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Subject: Final Comments on November 2012 Draft of the Remedial Investigation Report, Operable Unit 3 - Upland Soils
2012
- November 20, 2012 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell, Subject: EPA's Approval of the October 2012 Revision of the Remedial Investigation Report for the Estuary, Operable Unit 1
- October 2012 Remedial Investigation Report Operable Unit One - Estuary LCP Chemicals Site, Brunswick, Georgia (FINAL)
- September 27, 2012 PRP's Response to EPA's Letter Date July 27, 2012 Remedial Investigation Report, Operable Unit #3 (Uplands) LCP Chemical Company NPL Site, Brunswick, Glynn County, Georgia
- May 18, 2012 Revised Redlined Remedial Investigation Report, Honeywell International Inc.
- May 9, 2012 Work Plan For Site-Wide Assessment for Petroleum Product
(Operable Unit 2), LCP Chemicals Site, Brunswick, Georgia
- May 8, 2012 Work Plan for Comprehensive Groundwater Sampling - 2012
(Operable Unit 2), LCP Chemicals Site, Brunswick, Georgia
- September 11, 2012 Final Work Plan for CO2 Sparging Proof of Concept Test, LCP Chemical Site, Brunswickk, Georgia
- April 19, 2012 Letter From Kirk Kessler, EPS to Galo Jackson, USEPA, Subject: Results of the July 2011 Sampling in the Former Brunswick-Altamaha Canal South of the LCP Chemicals Site, Brunswick, Georgia, Revision Dated April 19, 2012
- April 13, 2012 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc. Subject: Review of Prelimanary Responses to EPA's Disapproval of the Draft Remedial investigation Report
- April 1, 2012 Work Plan for Site-Wide Assessment for Petroleum Product (Operable Unit 2), LCP Chemicals Site, Brunwick, Georgia
- April 1, 2012 Work Plan for Comprehensive Groundwater Sampling - 2012 (Operable Unit 2), LCP Chemicals Site, Brunwick, Georgia
- April 1, 2012 Remedial Investigation Report Operable Unit 3 - Upland Soils, LCP Chemicals Site, Brunwick, Georgia
- March 22, 2012 Ready for Reuse Determination, Quadrant 1, Operable Unit 3, LCP Chemicals Site, Brunwick, Georgia
- February 29, 2012 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc. Subject: Notice of Disapproval of December 2011 Draft of the Remedial Investigation Report, Operable Unit 1 - Estuary
- February 29, 2012 Memorandum From Galo Jackson, USEPA to File. Subject: Petroleum Hydrocarbons and Quadrant 1
- February 22, 2012 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc. Subject: Human Health Risk Assessment for the Unland Soil, Operable Unit Three: LCP Chemicals Superfund Site, Brunswick, Glynn County, Georgia
- February 17, 2012 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc. Subject: Caustic Brine Offsite Shipments: LCP Chemical National Priorities List Site, Brunswick, Glynn County, Georgia
- February 10, 2012 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc. Subject: Draft Data Report: Results of July 2011 Sampling in the Former Brunswick-Altamaha Canal, South of the LCP Chemicals Superfund Site, Brunswick, Glynn County, Georgia
- January 2012 Human Health Baseline Risk Assessment for Upland Soils (Operable Unit 3) LCP Chemicals Site, Brunswick, Georgia (FINAL)
2011
- November 30, 2011 Letter From Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc. Subject: Human Health Risk Assessment for the Estuary, OU1: LCP Chemicals Superfund Site, Brunswick, Glynn County, Georgia
- November 1, 2011 Honeywell Brunswick Caustic Brine Pool Offsite/Onsite Treatment Evaluation Report
- October 18, 2011 Email from Kirk Kessler, EPS to Galo Jackson, USEPA. Subject: FW: DRAFT OU3 HHRA
- October 11, 2011 Data Report: Results of the July 2011 Sampling in the Former Brunswick-Altamaha Canal, South of the LCP Chemicals Site, Brunswick, Georgia
- August 1, 2011 Human Health Baseline Risk Assessment for the Estuary, Operable Unit 1, Marsh Trespasser, Fish and Shellfish Consumer, Clapper Rail Consumer, dated August 2011 (FINAL)
- July 26, 2011 Memorandum from Kevin Kopopec, USEPA to Galo Jackson, USEPA. Subject: Review of Revision 4 (July 2011) Human Health Baseline Risk Assessment Operable Unit 1 Report for the LCP Chemicals, Brunswick, Georgia Superfund Site
- July 13, 2011 Memorandum from Shanna Alexander, GDNR to Jim McNamara, GDNR. Subject: Review of the Draft Human Health Baseline Risk Assessment for the Estuary, OU1 Mash Trespasser Fish and Shellfish Consumer, Clapper Rail Consumer Dated July 2010
- July 1, 2011 Tables 1 Through 27 to the HHRA (DRAFT)
- July 1, 2011 Revised Draft Human Health Baseline Risk Assessment for Upland Soils (Operable Unit 3) LCP Chemicals Site, Brunswick, Georgia (DRAFT)
- July 1, 2011 Redline Draft Human Health Baseline Risk Assessment for the Estuary, Operable Unit 1, Marsh Trespasser, Fish and Shellfish Consumer, Clapper Rail Consumer, Revision 4 Dated July 2011 (DRAFT)
- July 1, 2011 ISM Dioxin/Furan Data Summary (Operable Unit3), LCP Chemicals Site, Brunswick, Georgia (FINAL)
- June 17, 2011 Email from Chris Saranko, EPS to Galo Jackson, USEPA, Subject: LCP OU1 HHRA - Revised Appendix B
- June 17, 2011 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc. Subject: Final Comments on Outstanding Issues from the OU3 (Uplands) Baseline Health Risk Assessment
- June 3, 2011 Short-Term Operations Plan for Collection of Bulk Quantity CBP Liquid in Support of a Pilot-Scale Treatabilty Evaluation with Water Recovery, Inc.
- May 27, 2011 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell International, Inc.: Leaching to Groundwater OU#3 (Uplands) Baseline Human Health Risk Assessment
- May 27, 2011 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell International, Inc.: Status Letter for Parcel B053080530011 and Tract 4 of Parcel B007800000001 - LCP Chemicals Superfund Site, Brunswick, Glynn County, GA
- May 24, 2011 Letter from Prashant Gupta, Honeywell to Galo Jackson, USEPA: EPA's Notice of Disapproval of December 2010 Draft of The Human Health Risk Assessment for the Estuary, OU1, Marsh Trespasser, Fish and Shellfish Consumer, Clapper Rail Consumer
- May 18, 2011 Letter form Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc.: Approval Revision 1 of the Work Plan for Sampling in the Former Brunswick-Altamaha Canal, South of the LCP Chemical Site
- May 17, 2011 Email from Galo Jackson, USEPA To Prashant Gupta, Honeywell International, Inc.: FW: CERCLA OFF-SITE Acceptability of Water Recovery, Inc, Jacksonville, FL
- May 17, 2011 Letter for Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc.: Notice of Disapproval of December 2010 Draft of the Human Health Assessment for the Estuary, OU 1, Marsh Trespasser, Fish and Shellfish Consumer, Clapper Rail Consumer
- May 16, 2011 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc.: Revised Draft Work Plan for the Development, Design, and Implementation of Conventional Treatment Measures to Enhance the Existing Causic Brine Pool Remedy
- April 25, 2011 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell International, Inc.: Final Baseline Environmental Risk Assessment (BERA) for Operable Unit 1, (ESTUARY) LCP Chemicals Superfund Site, Brunswick, Glynn County, Georgia
- April 25, 2011 Letter from Kirk Kessler, EPS to Galo Jackson, USEPA: Honeywell's Response to EPA's Letter Dated April 6, 2011 Regarding Outstanding Issue from OU3 (Uplands) Baseline Human Health Risk Assessment
- April 19, 2011 Email from Chris Saranko, EPS to Galo Jackson, USEPA: Response to ISM Work Plan
- April 18, 2011 Letter from Kirk Kessler, EPA to Galo Jackson, USEPA.: Draft Phase I/II Environmental Site Assessment for the Former Drive-In Theater Area, Prepared in 1993 by Southeastern Environmental Audits, Inc.
- April 14, 2011 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell, Inc.: Comments on Draft Work Plan for Dioxin/Furan Characterization: LCP Chemical Site, Brunswick, Glynn County, GA
- April 6, 2011 Letter from Galo Jackson, USEPA to Prashant Gupta, Honeywell International Inc.: Outstanding Issues from OU3 (Uplands) Baseline Human Health Risk Assessment: LCP Chemical NPL Site, Brunswick, GA
- April 4, 2011 Letter from Prashant Gupta, Honeywell to Galo Jackson, USEPA Revised Draft Work Plan for the Development, Design and Implementation of Conventional Treatment Measures to Enhance the Existing Caustic Brine Pool Remedy
- April 2011 Baseline Ecological Risk Assessment for the Estuary at the LCP Chemical Site in Brunswick, Georgia. Site Investigation/Analysis and Risk Characterization (Revision 4) (FINAL)
- March 31, 2011 Revision 1 of Work Plan for Sampling in the Former Brunswick-Altamaha Canal, South of the LCP Chemicals Site, Brunswick, Georgia (FINAL)
- March 30, 2011 Letter From Kirk J. Kessler to Galo Jackson, Response to agency comments on the Draft Work Plan for Sampling in the Former Brunswick-Altamaha Canal
- March 18, 2011 Workplan For Dioxin/Furan Characterization, LCP Chemicals Site, Operable Unit 3, Brunswick Georgia, Prepared for Honeywell, Prepared by Environmental Planning Specialists, Inc. (FINAL)
- March 16, 2011 Workplan for Dioxin/Furan Characterization, LCP Chemicals Site, Operable Unit 3, Brunswick, Georgia
- March 10, 2011 Summary Level Notes, ISM Sampling Plan, LCP Chemicals Site, Brunswick GA,
- March 9, 2011 Letter From Galo Jackson to MR. Prashant K. Gupta, Disapproval of December 30, 2010 Draft Work Plan for Sampling in the Former Brunswick-Altamaha Canal, South of the LCP Chemical Site, Brunswick GA
- January 18, 2011 Letter From Kirk J. Kessler to Galo Jackson, Screening of Constituents with Limited Detections and Detection Limits Exceeding the EPA Regional Screening Level Table Operable Unit #3 (OU3), LCP Chemicals Site, Brunswick, Georgia
2010
- August 2010 Baseline Ecological Risk Assessment for the Upland at the LCP Chemical Company Site, Brunswick, GA. Site Investigation/Analysis and Risk Characterization (FINAL)
- January 4, 2010 Human Health Baseline Risk, Assessment for Upland Soils, Operable Unit 3. LCP Chemicals Site, Brunswick, GA. DOCID 10717420 (DRAFT)
1997
- December 1, 1997 Close-Out Report: North Area, Revision 0, LCP Chemicals-Georgia, Brunswick, Georgia
1995
- 1995 Legend Upland Dioxin Sampling Location ISM Grids and Supporting Figures, Figure 1. Locations of EPA Upland Soil Samples for Dioxin/Furans, Figure 2. Post Removal Aroclor 1268 in Surface Soil, Figure 3. Post Removal Aroclor 1260 in Surface Soil, Figure 4. Post Removal Aroclor 1254 in Surface Soil, Figure 6a. Proposed ISM Decision/Sampling Units Quadrant 1, Figure 6b. Proposed ISM Decision/Sampling Units Quadrant 2, Figure 6c. Proposed ISM Decision/Sampling Units Quadrant 3, Figure 6d. Proposed ISM Decision/Sampling Units Quadrant 4.