Freedom of Information Act (FOIA)

Final Groundwater Interim Measures Sampling and Analysis Plan

Final Groundwater Interim Measures Sampling and Analysis Plan. Revision 1.0; October 9, 2012. This document serves as the quality assurance and quality control document for the groundwater sampling performed during the Interim Measure, both for the area of the former chemical plant located on the site and for the off-site area east. 

You will need Adobe Reader to view some of the files on this page. See EPA’s About PDF page to learn more.